Skip to content
Lusaka, Zambia
Custody and release

Agree the release before the goods arrive

Safekeeping starts with a clear description of the goods and written instructions for their return. Discuss the proposed location, holding period and release conditions with our team before arranging delivery.

Discuss safekeeping

Inventory control

What should the handover record?

Agree the identifiers both sides will rely on, especially where goods are sealed or grouped in bundles.

Goods presented

List the packages, marks, serial or seal references where applicable, and the visible condition to be noted.

Release authority

Name who may instruct a release and agree how an instruction or change of collector will be verified.

Collection

Agree what the collector must present and who will acknowledge the quantity handed over.

A shipment in practice

When the depositor and collector are different

A supplier may deposit sealed cases while its buyer arranges collection days later. The names on the delivery note alone do not tell the receiving team which cases the buyer may take. Before deposit, agree what each party can instruct, how the cases will be identified and who should receive a query if the instruction is incomplete.

Changing a collection instruction

A vehicle substitution or revised quantity needs a clear link to the original instruction. Discuss the change procedure when arranging the hold.

  1. Step 1 of 3

    Identify what has changed

    Quote the deposit reference, the collection already arranged and the specific amendment. Say whether the old instruction is withdrawn in full or only partly revised.

  2. Step 2 of 3

    Route the revision for confirmation

    Use the contact and channel agreed at deposit. Allow time for the receiving point to check the change before a replacement collector travels.

  3. Step 3 of 3

    Record the outcome

    Ask for the release reference, the quantity collected and the outstanding balance. Retain the revised instruction alongside the collection acknowledgement.

Define the limits of the intake record

Agree what can actually be observed at receipt. The level of detail affects what the parties can later reconcile.

Description suppliedPoint to agree before deposit
Four sealed casesWill the record list the four cases and their external seal references? Who can authorise opening if a contents check is needed?
A mixed lot under one referenceCan part of the lot be released? If so, which item references distinguish the released goods from the remaining goods?
Goods presented with existing marksWhat visible condition notes or agreed photographs should accompany the intake acknowledgement?

Questions and answers

Before booking safekeeping

Ask for written confirmation of any condition that matters to your decision to deposit goods.

Can someone inspect goods during the holding period?

Describe the purpose, who would attend and whether anything must be opened or moved. The team can check the proposed arrangement with the holding location.

What if the collection reference does not match?

Contact the agreed operations contact with the reference you expected and the part that differs. Ask for clarification before treating the collection as authorised.

Discuss special conditions privately

Use the initial enquiry for a general cargo description and your contact details. The team can agree an appropriate channel for sensitive references, ownership documents or a detailed inventory.

Discuss safekeeping