Copper cathodes, bundle by bundle
A cathode consignment needs a loading plan that works with the actual bundles on the ground. Send the bundle list, declared weights, loading site and delivery point when asking us to plan a movement.
What the load plan needs
A nominal tonnage is a starting point. Bundle dimensions, individual weights and the equipment on site determine how the collection can be organised.
Bundle identification
Share the marks or references that must be matched to the dispatch list and checked by the receiver.
Loading arrangements
Identify who will load the vehicle, the equipment available, the site access requirements and the proposed weighing point.
Routing and receipt
Confirm the proposed destination, consignee reference and any onward port, storage or cross-border handover.
A shipment in practice
Keep the mine lot visible through dispatch
A buyer may order one lot while the loading site prepares it across several collections. If the dispatch list uses mine references and the buyer uses purchase-order lines, include both in the movement brief. That link lets the receiving clerk identify which part of the order a particular vehicle has delivered, even when another load arrives first.
Build a dispatch schedule by collection
Use one line per proposed movement. Leave unknown fields marked as estimates and update them when the loading point confirms the particulars.
| Field | What to record | Who can confirm it |
|---|---|---|
| Commercial reference | Buyer’s order, mine lot and intended receiver | Shipper and consignee |
| Dispatch allocation | The bundles assigned to this collection and their listed weight | Loading supervisor |
| Weighing record | Declared or measured weight, unit, basis and ticket reference if available | Shipper or appointed weighing point |
| Delivery appointment | Receiving point, booking reference and contacts for changes | Consignee or terminal representative |
Plan a movement with an onward handover
For an inland collection feeding a border or port, work back from the party expecting the cargo.
- Step 1 of 3
Confirm the receiving instruction
Identify the consignee’s delivery point and whether it expects delivery into a yard, warehouse or terminal. Note any appointment already agreed with that party.
- Step 2 of 3
Check the sequence of collections
Identify which bundles will be ready first and who can approve a revised allocation. A change to the first vehicle may also affect the final balance.
- Step 3 of 3
Close each movement separately
Match the dispatch list to the receipt for that collection. Carry forward any query under the same reference before reconciling the complete order.
Questions and answers
Questions about cathode movements
An initial enquiry can start before the final bundle list is available.
Can I request a budget figure for a proposed lot?
Send the collection and delivery points, indicative tonnage, expected dates and the information still outstanding. Ask which assumptions would change the figure when the lot is finalised.
What if the receiving weight differs from dispatch?
Keep both records, identify the affected vehicle and bundles, and state how each weight was described. Share the references with the named parties for reconciliation.
Other mineral cargo
For bagged or containerised mineral cargo, describe the product and packaging separately. Give the packed weights and any handling information supplied by the shipper so we can assess the request on its own terms.